Access to reliable, high-quality water is a cornerstone of sustainable development in Kenya, especially amid frequent droughts and expanding agricultural needs. Teko Engineering Ltd leads the market with high performance borehole systems that deliver superior yield, durability, and efficiency, tailored for farms, businesses, schools, and homes nationwide.
Understanding High Performance Boreholes
High performance borehole systems go beyond basic drilling to ensure optimal water extraction rates, longevity, and minimal maintenance. These systems incorporate advanced geophysical surveys, premium casing materials, and high-yield pump integrations for yields exceeding 50 cubic meters per day—ideal for irrigation or commercial use.
Teko Engineering designs each borehole with site-specific hydrogeology, achieving a 92% first-time water strike rate, far above the industry average of 75%. This precision stems from in-house geologists using Transient Electromagnetic (TEM) technology for pinpoint accuracy, preventing dry holes and costly redrills.
Teko Engineering's Complete Service Offering
As a fully integrated provider, Teko Engineering owns its fleet of DTH rotary rigs, water bowers, and 4x4 logistics vehicles, eliminating subcontractor delays. Services span hydrogeological surveys, permitting, drilling, casing, gravel packing, test pumping, pump installation, and 24/7 maintenance support.
The process begins with a free initial assessment at teko.co.ke, followed by WRMA-approved surveys and NEMA-compliant Environmental Impact Assessments (EIA). Drilling costs KES 2,500-4,500 per meter—30-50% below market rates—thanks to owned equipment and no middlemen markups.
Post-drilling, Teko installs submersible solar or electric pumps with solar panel options for off-grid reliability. Every project includes a 10-year casing warranty, one-year maintenance, and water quality certification, ensuring zero legal hurdles for clients.
Innovative Financing: Malipo Pole Pole
Teko's "Free Borehole Drilling Service" revolutionizes access by allowing drilling without upfront payments. Clients pay via flexible instalments starting Month 2, matched to cashflow—for example, a KES 850,000 100-meter borehole in Machakos equates to KES 25,000/month over 36 months at 1.2% interest.
This model targets underserved areas like Kitui farms, Machakos schools, and Nakuru businesses, where traditional loans fail. Over 2,500 boreholes drilled since 2018 boast 96% on-time repayments and 4.9/5 Google ratings, proving affordability drives performance.
Technical Superiority of Teko Systems
High performance demands robust construction: Teko uses continuous mild steel casings (10-inch surface, 8-inch main) with slotted sections at aquifers for optimal percolation. Gravel packing filters impurities, while 24-hour test pumping verifies yield and recharge rates.
In ASAL regions like Mandera, Teko's rigs handle mud and air drilling seamlessly—KES 7,200/meter for stable rock, KES 14,500 for loose soils—delivering yields sufficient for homesteads (2m³/day) or large farms (50m³+).
Solar-integrated systems reduce energy costs by 70%, with 24/7 emergency fixes ensuring uninterrupted supply. Unlike competitors' 1-2 year warranties, Teko's 10-year guarantee reflects confidence in engineering excellence.
Nationwide Coverage and Compliance
From Nairobi to Mandera across 24 counties, Teko's logistics ensure rapid mobilization. All boreholes meet WRMA Class A standards, NEMA EIA requirements, and county permits, with hydrogeological reports and chemical analyses included.
Licensed and insured, Teko handles full paperwork, sparing clients bureaucracy. This compliance edge prevents permit rejections common with unregulated drillers, securing long-term water rights.
Real-World Impact and Case Studies
In Kitui, a farmer's 120-meter borehole now irrigates 10 acres, boosting yields 300% via Teko's pump and financing. A Machakos school gained water Day 1, serving 500 pupils without fundraising—repaying via modest fees.
Nakuru businesses report zero downtime with Teko's same-day repairs. These successes underscore how high performance systems transform livelihoods, supporting Kenya's Vision 2030 water security goals.
Cost Breakdown and Savings
| Component | Teko Price (KES) | Market Average (KES) | Savings |
|---|---|---|---|
| Survey & Permits | Included | 50,000-100,000 | 100% |
| Drilling (per meter) | 2,500-4,500 | 4,000-8,000 | 30-50% |
| Casing & Gravel | Included | 200,000-400,000 | Full |
| Pump Installation | 150,000-300,000 | 250,000-500,000 | 40% |
| Total 100m Borehole | 500,000-850,000 | 1,000,000-2,000,000 | Up to 60% |
Transparent itemized contracts avoid surprises, with no deposits required.
Why Choose Teko Over Competitors?
-
Owned Fleet: No rentals or delays.
-
Expert Team: In-house geologists, NEMA drillers.
-
Superior Success Rate: 92% vs. 75%.
-
Financing Innovation: Drill now, pay later.
-
Warranty & Support: 10 years + 24/7 service.
Competitors charge 20-30% more with deposits and shorter warranties. Teko's model yields lowest total ownership cost.
Maintenance for Peak Performance
Regular servicing extends borehole life indefinitely, as long as aquifers recharge. Teko's contracts include annual checks, backflow prevention, and pump optimizations—preventing failures proactively.
Clients access teko.co.ke for bookings, with 24/7 hotlines for emergencies.
Future-Proofing with Teko
As Kenya faces climate volatility, Teko's high performance systems integrate smart monitoring for real-time yield data. Solar expansions and agronomy support (free for clients) maximize ROI for farmers.
Comments 12
Very informative article! We're looking at drilling a borehole on our farm in Machakos and this has given us a clear picture of what to expect. The cost table is especially useful — do prices vary much between counties?
Hi Faith! Yes, costs do vary by county — mainly due to geological depth and transport of equipment and materials. Machakos typically falls in the 60–120m depth range (basement complex). We'd be happy to provide a free site assessment and quote. Please reach out via our contact page!
Is the Lipa Pole Pole plan available for commercial properties, not just residential? We run a small hotel in Nakuru and our water bills have become unsustainable.
The section on water quality testing is something most guides skip over. Thank you for mentioning fluoride specifically — it's a real concern in parts of the Rift Valley. How long does it take to get water quality results back?
Leave a Comment